Grossmont Hospital, San Diego, CA

  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

The project included phase II of the Critical Care Unit build-out, which upgraded 25,000 square-feet on three floors. The Diagnostic and Treatment Building additions consisted of construction of a new pharmacy, clinic lab, and up to nine additional multi-purpose operating rooms. The Central Energy Plant addition and renovation allowed for infrastructure upgrades to support the nursing units on four floors and the new Diagnostic and Treatment additions.

Geotechnical Services: Engineering Recommendations, Foundation Excavation Observation & Recommendations

Special Inspection & Materials Testing: Concrete, Welding