Palm Springs Airport Masterplan, Palm Springs, CA

  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

SCS&T was contracted through the City of Palm Springs to provide professional geotechnical, special inspection, materials testing, and third party QA/QC services on Phases 1 through 3 of the Airport Masterplan in Palm Springs.  Phases I and II entailed the expansion of the existing two lanes into six lanes at the security checkpoint.  There was the addition of a second concourse, a new holding area for regional airlines to accommodate 7 to 12 aircraft, and an airport security wall.  Phase III included improvements, modifications, and rehabilitation of the terminal complex including 6,500 square feet of new floor space.
 
Geotechnical Services: Geotechnical investigation; Observation & Testing of Grading, Subgrade, Backfill & Underground Utilities
  
Special Inspection & Materials Testing: Concrete, Welding, Masonry, Fireproofing, Post Tension Concrete
 
Third Party QA/QC Services: Roofing