Sharp Memorial Hospital, San Diego, CA

  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

The project is a new 315,000 square-foot hospital featuring all-private patient rooms, a new and expanded emergency and trauma center, a new surgery center and advanced medical technologies. The seven-story, 334-bed facility cost $194 million and is considered San Diego’s hospital of the future. SCS&T provided the following services:

Geotechnical Services: Verification of Soil Conditions; Observation & Testing of Grading, Underground Utilities, and Wall Backfill; Foundation Excavation Observation

Special Inspection & Materials Testing: Masonry, Concrete, Welding, Post-Tension Concrete, Floor Flatness Testing

Third Party QA/QC Services: Waterproofing, Roofing, Installation of Windows and Lath System