Torrey Hills Center, San Diego, CA

  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

The project consisted of an 85,000 square-foot shopping center, which includes a 43,000 square-foot Vons grocery store, five single-story retail structures, a two-story 45,000 square-foot medical building, two-story parking structure, and three single-story detached kiosks. The project also included retaining walls and surface parking. SCS&T provided the following services:
 
Geotechnical Services: Geotechnical Investigation: Pavement & Foundation System Recommendations; Observation & Testing of Grading, Underground Utilities, Wall Backfill, Subgrade, Base & Asphalt
 
Special Inspection & Materials Testing: Concrete, Masonry, Welding