Tower 23 Hotel, San Diego, CA

  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

SCS&T provided professional services related to Geotechnical earthwork and observation testing, as well as Special Inspection and Materials Testing for the three-story, 45,000 square-foot hotel with an 8,000 square-foot restaurant and underground parking.

Geotechnical Services: Earthwork Observation & Testing

Special Inspection & Materials Testing: Concrete, Shotcrete, Post-Tension Concrete, Masonry, and Welding