UCSD Medical Center - Hillcrest Emergency Power Generator Upgrade, San Diego, CA

  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • : Function ereg() is deprecated in /var/www/yin80.com/htdocs/includes/file.inc on line 646.
  • warning: Parameter 1 to theme_field() expected to be a reference, value given in /var/www/yin80.com/htdocs/includes/theme.inc on line 171.

SCS&T provided Phase II services for this new one-story facility at UCSD Medical Center, which consists of approximately 16,295 square-feet and was constructed for the purpose of housing two new 1500 KW, 4160V generators.

Geotechnical Services: Earthwork Observation & Testing 
Special Inspection & Materials Testing: Masonry, Concrete, Field Welding, Ceiling Wire Pull Test, High-Strength Bolting